MARA DAY EVENT MODULAR FOR LED STRUCTURE IN EVENT & LIFESTYLE

MARA DAY EVENT MODULAR FOR LED STRUCTURE

Details:

On 15th March 2025, we supply and installs our Octalock Modular Scaffold System for a prominent Lahyer Tower LED structure at MARA Day 2025.
Our modular system was used to construct a scaffold measuring 12m (Length) x 2m (Width) x 8.3m (Height). The project showcased the capability of the Octalock system, which features an innovative octagonal connection design—allowing for rapid and secure assembly without compromising on stability or load-bearing capacity.
Thanks to this system, our team was able to complete the full setup within a few hours, dramatically reducing installation time compared to conventional scaffolding methods. For large-scale, high-profile events where time and precision are non-negotiable, Octalock delivers unmatched efficiency.
Our scaffold structure stood strong throughout the event and was fully dismantled on the same day by 2 PM—highlighting the speed, reliability, and practicality of our system in the fast-paced event industry.

Scope of Work:

1. Material Supply: Provision of modular scaffolding components suitable for shoring applications.
2. Design & Drawing: Custom design and structural drawings for the shoring system, tailored to the housing layout and load requirements.
3. Engineering Calculation: Structural calculations to ensure the scaffolding meets safety and performance standards for shoring support.
4. Manpower Supply: Provide professional scaffolder to erect and dismantle structure in a timely manners and safe environment.

Write a comment
Open chat
Silara Akses Sdn Bhd
Hello 👋
Can we help you?